Atlanta Beltline
Services
Soil Remediation
Location
Atlanta, GA

Winter Environmental was contracted to excavate TSCA regulated, PCB impacted soils along the Southside Beltline Trail in Atlanta. Work was delivered in two phases during 2025.

Phase 1 focused on establishing site access and removing roughly 450 tons of TSCA regulated material. Excavation followed a grid system developed from sitewide soil borings and survey data.

Phase 2 extended the access road and expanded excavation efforts. Crews removed about 6,800 tons of TSCA regulated Subtitle C soil and 2,100 tons of non-hazardous Subtitle D soil. The team also installed a visual barrier to support future earthwork and backfilled the excavated areas to within two feet of the contractor’s final grade.